go to the Hybrid Switchgear product page Anonymous asked on Jan 19th, 2015 in Hybrid Switchgear

When using cable connections, is it needed to repeat the HV testing on site? If not, why?

Alberto Zulati, Global Product Manager PASS

ABB's answer

“If cable enclosure is to be assembled on site (due to transportation limitations) it is possible to add a gas segregation between main module and cable termination so that the main module is fully tested at factory and is transported with SF6 inside so no repetition of HV test on site is needed.